|
Build Your Online Product Catalogs?
Product Name: |
bridge formwork
|
Supply Ability: |
|
Related proudcts |
bridge formwork, |
Specifications |
bridge deck、mivan aluminium formwork,permanent formwork systems |
Price Term: |
|
Port of loading: |
|
Minimum Order |
one 20 ft container |
Unit Price: |
T/T L/C (bank transfer) |
|
Competitive advantage
?High construction efficiency
The formwork system is easily to assembling, in the procedure of construction, crane is not depended. The movement of formwork is achieved by traveling machine.
? Good safety performance
The formwork system is not needed to dismantle and move by auxiliary tool or machine, and there are all-around operation platforms, all this makes GTF system in good safety performance.
|
Company: |
CCCC FWK International Formwork Corporation
|
Contact: |
Ms. Cao Angela |
Address: |
2 floors,No 1 Building, FWK business center,Cangzhou east economic development zone |
Postcode: |
|
Tel: |
86-317-4710588 |
Fax: |
86-317-4710188 |
E-mail: |
|
|
|
|